Things are going ahead a bit more quickly on the boat. DC electrical system is almost finished, which hopefully means that the AC system will be started and finished by the end of next week. Plumbing is on the way to being completed too, so we'll be able to run the taps, have a shower and flush the loos without fear of sinking or flooding the boat. John has been busy with the electrician, Pete, trying to get the old fridge to work. A fridge technician is coming to the boat this morning to assess whether it is worth continuing with the repairs. Robin, our refit manager, remains hopeful that the fridge is salvageable, but John and I are pretty sure we will be replacing it, we'll just have to wait and see.
Yesterday, Adam was helping out with some measuring and problem solving in the galley. He was quite excited about the fresh water manual pumps for drinking water.
We've decided to splurge and replace out saloon windows. They old ones a rather badly scratched up and T-Cut and polishing doesn't seem to be helping all that much, there are just too many scratches. So, I am off to Southampton with the old windows so they can be used as a template for the new ones. Hopefully these windows will be ready the about 10 days. May the lovely sunny weather continue until then.
No comments:
Post a Comment